Offer sheet
Nº 356318
Perfect binders
MUELLER-MARTINI CORONA C12 from 2003
Key data
Offer
356318
Year
2003
Manufacturer
MUELLER-MARTINI
Model
Corona C12
Condition
Good
Availability
Under option
Condition
01Complete and working
Description
Model CORONA CC12-22
Suitable for production of:
Soft cover perfect bound books for hotmelt glue or PUR
gathering line MM 3695 with 15 automatic feeding stations
manual feeding station
Reject gate, for incomplete products: 3614
Intermediate elements
Transfer into the binder
perfect binding line Corona CC12-22 with 22 clamps
3642 Book Block feeder
Hotmelt spine and side gluing
Premelter 80 ICS
Premelter
2 end sheet tipping feeders for hardcover spine
Roughening station
Nipping station
Vertical cover feeder
One nipping and pressing station
Lay down device
long conveyor with cooling system
Double Production
3641 Spiral Raceway
Jogging Unit
Commander Control & Operating Station
Spine Preparation Station
Laydown Delivery
Conveyor System
MM Zenith-S 3672 three knife trimmer
MM CB-16 stacker with counting
Dismantled
In stock
Suitable for production of:
Soft cover perfect bound books for hotmelt glue or PUR
gathering line MM 3695 with 15 automatic feeding stations
manual feeding station
Reject gate, for incomplete products: 3614
Intermediate elements
Transfer into the binder
perfect binding line Corona CC12-22 with 22 clamps
3642 Book Block feeder
Hotmelt spine and side gluing
Premelter 80 ICS
Premelter
2 end sheet tipping feeders for hardcover spine
Roughening station
Nipping station
Vertical cover feeder
One nipping and pressing station
Lay down device
long conveyor with cooling system
Double Production
3641 Spiral Raceway
Jogging Unit
Commander Control & Operating Station
Spine Preparation Station
Laydown Delivery
Conveyor System
MM Zenith-S 3672 three knife trimmer
MM CB-16 stacker with counting
Dismantled
In stock
Price
Upon request
FCA · Incoterms · bank transfer or L/C
Enquiries
WhatsApp +49 172 371 8407
https://ww2.roepa.com/offers/mueller-martini-corona-c12-from-2003-356318
Inspection under power welcome — dismantling, transport and commissioning arranged.